The Complete Guide to Landscape and Pavements for Villas, Palaces and Projects in Saudi Arabia

Most people picture grass and trees when they hear the word landscape, yet the part that decides how a site looks and lasts is the hardscape underneath. This guide walks villa owners, developers and companies in Saudi Arabia through curbs, walkways, interlock, planters, drainage, soils, lighting and maintenance, so you can plan with confidence, compare offers clearly and follow the work on site.

Yam Integrated Construction teamUpdated October 202634 min readالنسخة العربية

What hardscape means and why it matters

When most people hear the word landscape they think of lawns, palms and flowering shrubs. In practice, the larger share of the work on any site is the hardscape. This means every fixed element built from concrete, stone, tiles and interlock pavers. The curbs that define roads and pavements. The footpaths that connect the gate and the entrances to the buildings. The yards and parking areas that carry vehicles every day. And the planters that hold the greenery and keep it separate from the areas where people and cars move.

Softscape, meaning the planting itself, comes afterwards and depends entirely on what was built before it. A tree needs a planter set at the right level with good drainage. A lawn needs clear edges that stop soil from washing onto the walkways. That is why every successful project starts with the ground itself, long before colours and plants are chosen.

Why this part matters more than owners expect

This is why it pays to understand each element before signing a contract. An owner who knows what he is asking for can compare quotations on equal terms and follow the work with confidence. He knows which questions to ask, and when to ask the team to pause before moving on to the next stage.

Throughout this guide we look at hardscape the way an experienced contractor does. We start with the ground and the soil, move through planning, layers, materials and drainage, and finish with quality checks, maintenance and the way Yam Integrated Construction (YAMIC) runs this kind of work. The aim is simple. When you finish reading, you should be able to look at a yard, a walkway or a car park and understand what was done well beneath the surface and what may cause trouble later.

The core elements of a landscape project

Every site is different in size and character, yet the same core elements appear in almost every project. Knowing the role of each one helps you set priorities and allocate the budget in a sensible way.

Curbs

The curb is the frame that defines the edges of roads, pavements and planters. Its role is not only visual. It holds the edges of the interlock in place and stops the pavers from creeping outwards over time. It guides rainwater towards the drainage points. And it protects the edge of the pavement from the impact of car tyres.

Pavements and footpaths

A pavement separates pedestrians from vehicles. A footpath links the different parts of the site, such as the gate, the main entrance, the garden and the annex. A good footpath has a comfortable width, a gentle fall that sheds water and a surface that does not become slippery.

Interlock for parking and yards

Interlock consists of concrete pavers that lock into each other and spread the load over a wider area. This makes them well suited to parking bays, garage approaches and yards where cars move and turn. A section can also be lifted and relaid when the services below need maintenance, which is one of their most practical advantages.

Planters and green areas

A planter defines where planting goes and keeps the soil contained. It must be prepared so that irrigation lines can pass through it and excess water drains away from walls and foundations rather than towards them.

The preparation layers

Beneath all of the above are layers that nobody sees after handover. Levelling, compaction, the base course and the bedding sand. These layers decide whether the surface stays firm and flat or settles and ripples with time. A beautiful paver laid on a weak base will fail just as quickly as a cheap one. That is why at YAMIC we give these layers the full time and attention they need before any paving starts.

Seen together, these elements form a system. The curbs hold the edges, the layers carry the load, the surface takes the wear, the planters manage water and soil, and the drainage carries rain away. When one part is weak, the others suffer. A good contractor plans them as one piece of work from the start rather than as separate jobs added one after another.

Who needs hardscape and how needs differ

Hardscape is not limited to large developments. Any site with traffic, entrances and open outdoor space needs it to some degree. The difference between projects lies in scale, the type of loads involved and the level of finish expected.

Villas and palaces

In a villa the owner usually focuses on the yard, the main walkway, the garage approach, the area around the pool and the outdoor seating. Here appearance and comfort matter as much as durability. The owner chooses interlock colours and patterns that suit the facade, and may combine interlock in the parking area with stone or outdoor tiles in the seating areas. In palaces the spaces are wider and the walkways longer, so drainage planning and the placement of planters become even more important.

Residential compounds

A compound needs a clear network of pavements and footpaths that link the units to the parking and shared facilities. It also needs parking that can handle repeated daily traffic. Unifying levels across the units is essential so that water does not run towards the entrance of one unit rather than another.

Land subdivisions and commercial projects

In subdivisions, curbs and pavements run over long distances. Keeping the lines straight and the levels consistent along the full length of each street is the main challenge. Commercial projects such as showrooms and centres need yards and car parks that carry heavier loads, as well as clear and welcoming entrances for visitors.

When there is a pool in the yard

If your project includes a swimming pool, it is wise to coordinate the landscape around it with the construction of the pool itself. The levels around the pool, the drainage locations and the service routes should all be set once, for the whole site. Planning them separately often leads to awkward steps, water flowing towards the pool and pipes that have to be rerouted after the paving is finished.

Whatever the scale, the same principle applies. The site is studied as a whole, the uses of each area are agreed with the owner, and only then are materials and details chosen for each part.

Site soils and their effect on pavement stability

Everything built on the ground depends on the ground itself. Soils in Saudi Arabia vary widely from one city to another, and often from one plot to the next within the same city. That is why the study of any landscape project starts with a simple question. What type of soil lies beneath the surface, and how will it behave under load and when it gets wet?

Soil typeWhere it is commonWhat to consider
SandyLarge parts of the Central and Eastern regionsNeeds thorough compaction with proper moistening and may need stabilising
ClaySome valleys and low lying areasSwells when wet and shrinks when dry, so it may need replacing or a thicker base
Saline sabkhaSome coastal sitesWeak bearing capacity and salts that attack concrete, so it needs special treatment
RockyHighlands and some city outskirtsGood bearing, but needs breaking and careful levelling
Old fillSites with buried construction debrisUneven and settles over time, so it must be removed

Backfill around buildings

In new villas, the zone right next to the building is backfilled after the foundations are cast. If this fill is not compacted in layers, it settles after the first rains or once irrigation starts. This is why you sometimes see a perfect pavement in the middle of a yard while the strip along the wall sinks. The solution is to compact the backfill in thin, moistened layers before any paving goes down.

Signs that call for a pause

When any of these signs appear, the soil must be dealt with first. Treatment may mean replacing a layer, adding stabilising material or improving drainage. Proper excavation and backfill is the foundation of everything that follows. A serious contractor writes down for the owner what he found in the soil and what he proposes to do about it before starting. Soil left untreated will show its problems on the surface, however good the paving is.

On sites where water sits close to the surface, the work may need to raise the finished levels or improve drainage beneath the layers. Permanent water under a pavement weakens any base, no matter how well it was compacted.

Planning before the first paver is laid

Most landscape problems begin long before construction. They start with a lack of planning or with a rush to get going. Good planning does not need to take long, but it does need the right questions.

Levels and drainage

The first question is where rainwater and wash water will go. Every area needs a clear fall towards a drainage point or towards a safe zone away from the buildings. The fall must be enough to move water away, yet gentle enough that people walking on it do not notice it. Any mistake here means water pooling in front of a door or along a wall.

Pedestrian and vehicle traffic

The second question is who will use each part. A path used only by people on foot is prepared differently from a garage approach that cars drive over. Mixing the two leads to sinking in areas that were never built to carry the load.

Services beneath the surface

The third question is what will run under the surface. Irrigation lines, outdoor lighting, drainage and any future cables. Leaving spare ducts in place before paving saves you from lifting the interlock later.

Coordination with the rest of the works

If you are planning timber seating or pergolas in the yard, fix the positions of their footings before paving so you do not have to cut pavers after they are laid. The same applies to gates, water tanks, outdoor kitchens and any feature that needs a concrete base or a service connection.

Putting the plan on paper

Even a simple sketch of the yard helps. It should show the main areas, the direction of falls with arrows, the drainage points, the routes of buried services and the areas that will carry cars. With this in hand, the owner and the contractor are talking about the same site, and every quotation can be compared against the same scope. Changes are also far cheaper on paper than on site.

The aim of planning is not to fix every detail in advance. It is to make sure that the decisions which are hard to reverse, such as levels, loads and buried routes, are taken once and taken correctly.

Layer build-up according to traffic type

A mistake that comes up again and again is preparing every area in the same way. A path that people walk on is different from a garage approach. A garage approach is different from a yard that a delivery truck or a water tanker enters. The difference is not only in the visible paver but in everything beneath it.

UseBase courseInterlock paverCurb
Footpaths and seating areasStandard compacted layerLight thickness suited to walkingLight garden curb
Private car parkingThicker layer with stronger compactionMedium thicknessMedium curb set in concrete
Yards and entrances used by trucksSeveral layers, possibly stabilisedHeavy thickness with an interlocking patternHeavy road curb

Why a thicker paver alone is not enough

Some owners believe that choosing a thicker paver solves the problem of heavy loads. The paver only spreads the load. What actually carries it is the base course and the soil beneath. If that layer is weak, a thick paver will sink just as a thin one does.

Thinking about the future

Ask yourself about the traffic you expect in the future, not only today. Will you add an annex that needs equipment to come in? Will a water tanker enter to fill the tank? Will part of the yard become a parking area? The route that this traffic will follow should be built with stronger layers from the start.

Boundaries between zones

Where a pedestrian zone meets a vehicle zone, it is best to place a curb or a clear dividing line. This stops drivers from straying onto the lighter area by mistake, and it keeps any possible settlement contained within its own boundaries.

Points of extra stress

Pay attention to places where a car stands for long periods or where the wheels turn while the car is stationary, such as the end of a parking bay or the area in front of a garage door. These spots face more pressure and twisting than the rest of the surface, so they deserve extra care in compaction and in the choice of laying pattern.

Ask for the drawing or the written quotation to state the type of traffic for each zone and the layer build-up that will be used there. This single item often reveals the real difference between one offer and another, because it shows what you will be getting beneath the surface rather than only what you will see on top.

Materials and what sets each one apart

The choice of material shapes how the site looks, how long it lasts and how much care it needs. No single material suits every place. Each use has the option that fits it best.

MaterialWhere it fitsStrengthsWhat to watch
Concrete interlockParking, yards and walkwaysCarries loads and can be lifted and relaidQuality of the layers beneath and joint filling
Outdoor tilesSeating areas and light walkwaysSmooth surface and a wide range of coloursChoose a slip resistant finish
Natural stonePrestige entrances and pool surroundsElegant look and high durabilityConsistent thickness and fixing method
Concrete curbsEdges of roads, pavements and plantersHold the edges and guide waterStraight lines and correct levels

Quality of interlock and curbs

Not all pieces are equal. A good piece has sharp, regular edges, a consistent colour within the same batch and a surface free of cracks. It is best to source the whole project from one supplier so that the shades do not vary from one area to another. On large surfaces even a slight difference between batches becomes very visible.

The base and the bedding sand

The materials you do not see matter more than the ones you do. The base course carries the load and spreads it. The bedding sand gives the surface its evenness. Using the wrong sand or a poorly compacted base will make even the finest interlock sink.

Natural stone at entrances

If you lean towards natural stone for entrances, choose a textured or honed finish that suits exposed outdoor areas. Polished stone may look striking in a showroom, but outside it can become slippery when wet and shows wear quickly. Stone also needs consistent thickness so that it sits evenly, and a fixing method suited to its weight and the traffic it will carry.

Combining materials

Many successful yards combine materials. Interlock where cars move, tiles or stone where the family sits, and curbs and planters that frame both. The key is to decide the material for each zone according to its function, then make sure the transitions between materials are clean and level. A neat edge between two surfaces is a sign of careful work. A gap filled with cement at random is a sign that the transition was not planned.

Interlock shapes and laying patterns

Interlock is not a single shape. There are rectangular, wavy, square and hexagonal pavers, in many colours and surface textures. The laying pattern itself affects both the appearance and the ability of the surface to handle vehicle traffic.

Common laying patterns

PatternHow it looksBest suited to
HerringboneAngled pieces locked together in a zigzagParking and entrances, as it resists pavers shifting under turning tyres
Running bondSuccessive rows with staggered jointsWalkways and pavements, giving a sense of direction
Basket weavePairs of pieces in alternating directionsSeating areas and quiet pedestrian spaces
Mixed size patternPieces of different sizesYards meant to have a natural stone look

Colours and borders

A border in a contrasting colour defines an area and gives it a tidy finish. A pedestrian route inside a yard can be marked in a lighter shade. Too many colours and patterns in a small space, however, make it feel busy. A good rule is a small, restrained palette across the whole site.

Cuts at the edges

The quality of laying shows at the edges more than in the middle. Cut pieces should be clean and not too small. A very small piece next to a curb tends to move and break. An experienced installer therefore sets out the pattern so that the cuts are balanced on both sides.

Around manholes and openings

Inspection chambers and drainage openings interrupt the pattern. Good work frames them with a full row or with precisely cut pieces, and does not leave a gap filled with cement any which way.

Choosing the surface

Ask to see a finished area laid in the same pattern and colour before you approve. A single sample in your hand does not give you a picture of the complete surface.

Remember too that the laying pattern affects the amount of cutting. Some angled patterns need more cutting at the edges, which increases waste and takes longer to lay. That is why the owner and the installer should discuss the desired look and its effect on the work before it is approved.

Curb types and how they should be fixed

A curb looks like a simple piece of concrete, yet it determines the life of the whole pavement. If the curb moves, the edges of the interlock move with it and the joints open up. Each location has a type that suits it.

Common types

Correct fixing

A curb is never set on sand. It sits on a concrete bed and is supported from behind by a sloping concrete haunch. This haunch is what stops it from leaning outwards under the pressure of the interlock and passing cars. Many tilted curbs seen along streets are the result of a missing or undersized haunch.

Line and level

String lines are set along the full route before installation, and each piece is adjusted to the line for both direction and height. On curves, ready made curved units or short consecutive pieces are used so the line stays smooth without broken angles.

Joints between units

Regular joints are left between curb units and filled with a suitable mortar. On long runs, expansion joints are placed at intervals set by the nature of the site. This matters especially in the Central Region, where the difference between day and night temperatures is large.

Faults you can spot yourself

Fixing the curbs before paving, and giving them enough time to set, is a step that must never be skipped. The shape and limits of all the interlock depend on them.

On projects where trucks pass close to pavements, it helps to choose a taller and heavier curb along those routes only. The rest of the site can use a standard curb. This way the budget goes where it is truly needed.

Drainage elements and how to choose between them

A fall on the surface is not always enough. In large areas, or in yards enclosed by walls, water needs a clear way out. This is where drainage elements come in. The choice depends on the size of the area, the rainfall in the region and, most importantly, where the water can actually be discharged.

ElementWhat it isWhere it fits
Linear channelA long channel with a grated coverIn front of garages, at gates and around pools
Point drainA small gully that collects water around itSmall areas and seating spaces
Inspection chamberA chamber where pipes meet and can be cleanedWhere pipes change direction or join
SoakawayA gravel filled pit that lets water seep into the groundSites with no nearby drainage network
Permeable pavingPavers with wider joints or porous bodies that let water throughQuiet parking and light traffic areas

Where to place a linear channel

The best place is where the fall changes direction or in front of a threshold you want to protect. For example, a garage entrance that sits lower than the street, or the door of an annex. The cover must suit the traffic that passes over it. A pedestrian grade cover will not carry cars.

Where does the water go

This is the question that must be answered before anything else. Is there a drainage network nearby? Can water be directed to the street? Or does the site need a soakaway? The serious mistake is directing water towards the foundations of the building or towards a neighbour.

By region

In the southern highlands rain is frequent, so sites need more channels and larger ones. In the Central Region rain is less frequent but can be heavy in a short time, so the site must be able to clear a sudden downpour. On the coast it helps to get the surface dry as quickly as possible to limit salt deposits.

Maintenance of drainage

Drainage elements fill up with sand and leaves over time. Choose covers that open easily, and ask for inspection chambers to be placed where they can be reached, not under planters. Clean them before the rainy season in your area.

Ask for the drawing to show the direction of falls with clear arrows and the position of every drainage element. This simple drawing lets the owner understand the path of water across the site and follow its construction personally.

Building planters and tree pits

A planter is not just a frame of curbs filled with soil. It is an element that brings water, soil and roots together next to walkways and walls. Built without thought, it becomes a source of damp, settlement and cracking around it.

Planters against walls

A planter placed against a building wall or a boundary wall wets the base of that wall with every watering. Over time salts and flaking appear on the plaster and paint. The solution is to waterproof the wall on the planter side before backfilling, or to leave a gap between the planter and the wall. The soil level should also sit below the level of the waterproofing on the wall.

Raised planters

A raised planter built from blocks or concrete needs waterproofing on the inside and drainage openings at the bottom. Otherwise water collects inside, the roots rot and water escapes through the sides, carrying salts onto the external cladding.

Tree pits within pavements

A tree inside a pavement or yard needs a pit of sufficient size filled with suitable soil. If the pit is too small, the roots look for space under the interlock and lift it. Root barriers are therefore used around pits that sit close to walkways, and a grille or gravel is placed around the trunk instead of paving tight against it.

Choosing trees next to walkways

Soil level in the planter

The soil surface should sit slightly below the top of the curb. This stops soil and water spilling onto the path during irrigation and keeps the neighbouring interlock clean.

Irrigation lines

Irrigation pipes enter the planter beneath the curb through protective sleeves laid before installation. The end of a curb should never be broken later to pass a hose through. Drip irrigation is preferred in planters near walls and walkways, as it puts water at the roots and keeps the surroundings drier.

If a planter sits above a basement roof or above a water tank, it needs an entirely different design. That includes strong waterproofing, a drainage layer and a root protection layer over the waterproofing. It must not be built the same way as a planter on natural ground.

Outdoor lighting and underground service ducts

The moment an owner regrets most is when he wants to add a light or an irrigation point after the paving is finished, only to find that the only way is to lift the interlock or break the tiles. All of this is avoided with one decision before work starts. Define the lighting and services, and leave spare protective ducts.

Types of landscape lighting

TypePurposeWhat to consider on site
Low path lightsLight the walking route from belowA small concrete base and a protected cable route
Recessed ground lightsLight trees and walls from belowDrainage under the fitting so water does not collect in it
Step and threshold lightsPrevent tripping at nightPositions fixed before the steps are built
Wall and boundary lightsGeneral lighting for the yardCoordinated with the facade and boundary wall

Protective ducts

These are empty pipes laid under walkways and yards at expected crossing points. Later, a cable, an irrigation pipe or a camera line can be pulled through them without any breaking. Their ends should be clearly marked in planters or small chambers, and their positions drawn on a plan handed to the owner.

Where to leave spare ducts

Safety and protection

Outdoor cables must be of a type suited to burial, with boxes sealed against water and dust. On the coast, metal parts corrode faster because of salt, so light fittings made of corrosion resistant materials are preferred. In the Central Region fine dust gets into any opening, so tight seals on covers matter.

Include the lighting and duct plan in the quotation or as an attachment to it. It is an important document for any future maintenance or addition, even if the contractor changes. A team that asks about these details before you do is a team thinking about the site in the long term.

It is also wise to test all the lighting at night before the trenches are closed and the joints are filled. Changing the direction or position of a fitting at this stage is quick and easy, while doing it after handover means disturbing finished work.

Planning yard zones in villas and palaces

A successful yard is not a space paved from wall to wall. It is a set of zones, each with a clear function. When these zones are arranged with care, the yard becomes a part of the home that is used every day, not merely a passage people cross to reach the door.

The main zones

Privacy

Privacy is among the most important needs of a Saudi family. Seating areas are therefore placed where neighbours' windows do not overlook them. Raised planters, trees and shade structures act as natural screens. Where space allows, the guest route is kept separate from the family and service routes.

Shade and the path of the sun

Watch how the sun moves across the yard before deciding where to place the seating. The side that stays in shade in the late afternoon is a good place to sit. The side exposed all day needs a shade structure, a pergola or trees. This also affects the choice of material, since a light surface stays cooler underfoot.

Connecting the zones

Walkways are what tie these zones together. They should follow the line of daily movement as directly as possible, because people cut across the lawn when a path winds without reason.

The pool surround

If the yard has a pool, its surround is a zone of its own. It needs a slip resistant, light coloured surface and a fall that takes water away from the pool, not into it. It also needs a separation between the route for shoes and the route for bare feet, and coordination of levels with the pool team.

In palaces these zones multiply and the distances between them grow. A master plan then becomes a necessity rather than a luxury, and the distribution of lighting and drainage across the zones becomes part of the design from day one.

Sketch these zones on a simple plan of the yard before choosing any material. Each material is chosen for a zone according to its function, not for the whole yard at once.

Safety and easy movement for the whole family

Landscape serves everyone. Elderly relatives, children, guests, and anyone using a wheelchair or pushing a pram. A design that considers them from the start usually costs no more, yet it prevents accidents and makes life easier for the family in the long term.

Changes in level

Small, unexpected steps are among the most common causes of tripping. Where there is a change in level, make it clear with a full step or a gentle ramp. Never leave a small difference that the eye fails to notice. It is also good practice to mark the edge of each step with a different colour or with lighting.

Ramps

A ramp that serves wheelchairs and prams should have a gentle slope and a textured surface, with a flat landing at the top and bottom for resting. At main entrances, a ramp beside the steps is a welcome addition where space allows.

Slip resistant surfaces

LocationSuitable surface
Pool surroundStone or tiles with a textured surface suited to bare feet
Ramps and outdoor stepsTextured surface with a clearly marked edge
Walkways in rainy regionsInterlock or stone with an unpolished surface
Car washing areasRough surface with fast drainage

Children

Lighting at night

Every change in level, every step and every turn in a path needs light. Low lighting aimed at the ground works better than high lighting that dazzles the eye.

Heat

In the summer of the Central and Eastern regions, dark surfaces become very hot. This can hurt children walking barefoot around the pool or in seating areas. Light colours and good shade are therefore preferred in these zones.

Ask the designer to walk the site with you and imagine the route of each family member. Small details show up during this walk far more clearly than they do on paper.

If there is an elderly person in the family, consider a handrail beside the outdoor steps and a bench near the entrance. These are simple additions that make a real difference to daily use.

How climate shapes the work across the Kingdom

Saudi Arabia is a large country with a varied climate. What works in one region may need adjusting in another. A contractor who works across several cities knows that the same material behaves differently depending on heat, humidity and rainfall.

The Central Region

In Riyadh, Qassim and Al Kharj the heat is intense, the air is dry and dust is ever present. Materials expand and contract between day and night. That is why it matters to leave suitable joints and to choose light colours for exposed areas so the surface does not overheat. It also matters to fill the joints well so dust does not settle in them and weeds do not grow between the pavers.

The coastal regions

In Jeddah, Dammam, Al Khobar and Jazan humidity is high and salts are present in both the air and the soil. These salts can appear on concrete surfaces as white patches. It is therefore better to choose materials with good density and to pay close attention to drainage so the surface does not stay damp for long. Some sites may also need a suitable protective treatment for the surface.

The southern highlands

In Abha, Khamis Mushait and Al Baha rainfall is frequent and the weather is cooler. Here drainage becomes the first priority. Falls must be clear, drainage points must be sufficient and surfaces must be slip resistant, because walkways stay wet for longer.

Climate and the other choices in this guide

Climate touches almost every decision covered here. It affects the spacing of expansion joints in long curb runs, the colour of pavers around pools and seating areas, the number and size of drainage channels, the choice of corrosion resistant light fittings on the coast and the tight sealing of covers against fine dust inland. It also influences the selection of trees that can thrive with moderate watering in each city.

For this reason, a specification copied from one city to another without review can cause problems. A good contractor reads each site on its own terms, looking at the soil, the exposure to sun and wind, the rainfall pattern and the nearby drainage options before fixing the details.

From our head office in Riyadh, we follow our projects in different cities and adjust the details to suit the nature of each site, so that the same quality of result holds whether the project is inland, on the coast or in the highlands.

Checking quality during the work and at handover

Many landscape defects do not show on handover day. They appear after the first rain or after cars have been passing for some time. The real inspection therefore happens during the work, at the stages that will disappear beneath the surface, and it is completed with a careful final check.

Checkpoints during construction

  1. After levelling. Have debris and weak soil been removed? Are the levels marked clearly?
  2. After compaction. Were the layers compacted in stages with moistening? Walking on a well compacted surface leaves no deep footprint.
  3. After the curbs. Are they straight and backed with concrete?
  4. Before paving. Have all spare ducts, lighting and irrigation lines been laid?
  5. During paving. Are pieces being mixed from more than one pallet so the colour is evenly spread?

The handover inspection

ItemHow to check itSign of good work
DrainageSpray water across the areasWater runs to the drainage points and does not pool
FlatnessA long straightedge in several directionsNo visible gaps under the straightedge
JointsClose visual inspectionEven width and filled with sand to the surface
CutsWalk along the edgesClean pieces, unbroken and not too small
StabilityWalk on and press the paversNo piece rocks or makes a sound
CurbsLook along their lengthA straight line or a smooth curve with no leaning

What to request at handover

The best test is water. If possible, ask for drainage to be tested by spraying enough water over each area before you sign. What pools under the hose today will pool under the rain tomorrow.

Do not rely on looking from a standing position. Crouch a little and look along the surface from a low angle. A slight ripple that is invisible from above becomes obvious from there. Inspect the areas at different times of day as well, because low side light reveals what the midday sun hides.

Landscape in compounds and large projects

In residential compounds and commercial projects the nature of the work changes. The areas are larger, more parties are involved and many trades work at the same time. Here organisation and coordination become as important as the quality of construction.

The master level plan

Before any unit is built, a level plan should be prepared for the whole project. It sets the height of every entrance and the route of every drop of water up to the point where it leaves the site. If each unit is built separately on its own terms, water may flow from one unit to another or collect on the internal road.

Dividing the work into phases

On large projects landscape is rarely built in one go. It is divided by zone or by the readiness of the buildings. Good phasing keeps the level lines consistent between phases and leaves protected temporary edges rather than open edges that erode.

Protecting completed work

The greatest threat to finished pavements on an unfinished project is heavy equipment and trucks driving over them. A temporary route for equipment should be set away from the paved areas, or the paving of internal roads should be postponed until the heavy works are complete.

Consistent supply

On a large project, materials arrive in many deliveries. Differences in colour or size between batches stand out clearly on wide surfaces. A single source and a written specification for each delivery should therefore be agreed from the start, and every delivery checked before use.

Coordination with networks

Water, sewer, power and telecom networks usually run beneath pavements and internal roads. Any delay in building them means opening the pavement later. The schedule should be arranged so the networks are complete and tested before the final layers begin.

What the project owner needs

At YAMIC we work on this type of project in Riyadh, Jeddah, Dammam and other cities. We treat landscape as part of the site infrastructure, not as a separate final finish, which spares the owner the problems that arise when several contractors overlap.

It also helps to state in the contract who is responsible for repairing any damage caused to completed pavements by another contractor working on site. This one clause prevents a great many disputes.

Maintenance after handover

Landscape that has been built well does not need complicated maintenance. It does need simple, regular attention that keeps it looking good and catches small problems before they grow.

Cleaning

Regular sweeping removes the dust and sand that collect on the surface. Washing with water is enough in most cases. Avoid very high pressure water on interlock, as it can wash out the jointing sand. Avoid harsh chemicals as well, since they may affect the colour of the concrete.

Jointing sand

Over time, the sand in the joints drops because of washing and wind. When that happens the pavers begin to move slightly. Topping up the joints as soon as you notice a shortfall keeps the surface tight and stops weeds from growing.

Watching for settlement and drainage problems

Repairing damaged areas

One of the advantages of interlock is that repairs are local. The damaged area can be lifted, the layer beneath recompacted and the same pavers laid back. This is why we recommend keeping a stock of spare pieces from the same batch at handover, so that the colour always matches.

Planters and irrigation

Irrigation water leaking from planters onto walkways weakens the layers beneath. Irrigation should be set correctly and any leak followed up and repaired straight away. Drip lines near walls and paths deserve particular attention, since a single loose fitting can keep the base wet without anyone noticing.

Drainage before the rainy season

Channels, gullies and inspection chambers gather sand and leaves. Open and clean them before the rains in your region, and check that water still runs to them freely by spraying a little water across the surface.

A short walk around the site from time to time, looking at joints, edges, curbs and drains, is often all it takes. Most issues that end in costly repairs start as a low spot, a loose paver or a blocked drain that went unnoticed. Caught early, they are simple to fix.

How YAMIC delivers landscape projects

At Yam Integrated Construction we treat landscape as part of the project, not as a last stage rushed at the end. We follow a clear method so the owner knows what is happening at every stage.

Site visit and survey

We start with a visit to the site. We measure the areas and lengths, record the existing levels and identify the drainage points. We also listen to how the owner uses the space, where the cars park and where the family likes to sit. These conversations shape the zones, the materials and the layer build-up for each part of the site.

A written quotation

After the visit, we send a written quotation that sets out the items, the quantities and the proposed material types. The owner can choose between supply and installation or installation only, using materials he provides himself. The quotation is clear enough to compare with other offers on the same basis.

Construction under engineering supervision

An engineer follows every stage, from levelling to compaction, to setting the curbs, to paving. We do not move on to a new stage before confirming that the previous one is sound. We send the owner regular photos showing the progress of the work, even when he is outside the city.

Handover and warranty

Where we work

From our head office in Riyadh we work across the cities of Saudi Arabia, including Jeddah, Dammam, Makkah, Madinah, Abha and Tabuk. We handle villa yards and small spaces as well as compounds and subdivisions, using the same method of site visit, written quotation and engineering supervision.

Because YAMIC also carries out excavation, concrete works, pools and infrastructure, the landscape on our projects is planned together with the works around it. Levels, drainage routes and buried services are agreed once for the whole site, which keeps the different trades from working against each other.

You can explore the service details and examples of our work on the landscape and pavements page, or ask for a site visit to start planning your own project.

Frequently asked questions

Yes, as long as the full plan is set from the start. Levels and drainage are defined for the whole site, then each part is built in its turn without conflicting with what comes after it.
It is better to start with the hard elements such as curbs, walkways and planters. Planting then follows on ready ground with correct levels and completed irrigation lines.
It can be used if its surface is slip resistant and its colour is light. Many owners prefer natural stone or outdoor tiles around the pool for a smoother surface to walk on barefoot.
Yes. We work on villa yards and small spaces as well as compounds and subdivisions, with the same method of site visit, written quotation and engineering supervision.
A drawing makes the work easier, but it is not required in every case. For simple spaces we rely on the site visit and measurements, and propose a clear layout before construction.
The area beside a new building is backfilled after the foundations are cast. If that fill is not compacted in thin, moistened layers before paving, it settles after rain or irrigation and the pavement above it sinks.

Plan your site landscape with the YAMIC team