Reinforced concrete, full internal lining, and fast supply and installation with a real 10-year warranty
We manufacture, supply and install underground and elevated concrete water tanks in ready-made sizes to suit your villa or project in Saudi Arabia, with a clear quote for your size and location, quality workmanship and a real warranty on every tank.
Ready-made sizes for every villa and project need in Saudi Arabia, in reinforced concrete with a real 10-year warranty. Pick your size and request a quote.
Need a different size?
We can design a custom-size tank to fit your space and needs exactly
Ask about a custom sizeBrowse our other services in Saudi Arabia
Reinforced concrete, full internal lining, and on-time supply and installation
Certified reinforced concrete
Built to standard engineering specifications to withstand water pressure
Full internal lining
Waterproof lining that prevents leaks and keeps the water clean
Fast supply and installation
Ready-made sizes that save you construction time
A real 10-year warranty
A written warranty on the tank that covers you after handover
From first contact to handover: clear steps with no surprises
Contact Us
Contact us by WhatsApp or phone and tell us the tank size you need
Choosing size and price
We help you choose the right size and send a clear quote with no surprises
Site Visit
A specialist team inspects the site and decides the best way to deliver and install
Supply and installation
We deliver and install the tank and prepare all connections with a specialist team
Handover & Warranty
Final tank handover with a real 10-year warranty
Our headquarters is in Riyadh, and our teams deliver projects across every region of Saudi Arabia with the same quality, engineering supervision and warranty.
The water tank is one of the most important parts of a villa or building, even though it is usually out of sight. It holds the water the family drinks, cooks with and washes in. Any flaw in how it is built or waterproofed shows up later as a leak, a change in the colour or smell of the water, or damage to nearby foundations.
In this guide we explain the types of concrete tanks, the stages of building them, how water tanks are waterproofed and the signs that an old tank needs repair. We also cover cleaning and disinfection, the effect of climate, the factors that drive cost and how to choose a contractor who gives you a clear written quotation.
Concrete tanks are not a single type. The choice depends on the size of the plot, the number of occupants, how water reaches the site and whether there is a suitable place for installation. That is why we start by understanding how the tank will be used before we talk about size.
| Type | Advantages | What needs attention |
|---|---|---|
| Underground tank cast in place | Can be designed in any size and shape that suits the plot and holds large volumes | Needs excavation and good external waterproofing against soil moisture |
| Precast concrete tank | Made to consistent specifications and faster to install on site | Needs suitable crane access and a prepared installation area |
| Concrete roof tank | Gives natural water pressure inside the building | Adds load to the roof and needs structural calculations and thermal insulation |
New villas need one to keep a safe reserve that covers the family when the water supply is interrupted. Palaces with more than one building, annexes and a large garden that uses irrigation water need one. So do residential buildings, commercial buildings and projects with many users. In some villas the solution is an underground tank for storage and a small roof tank for distribution, with a pump between them.
Size depends on the number of family members, daily consumption and whether there is a pool or garden. It also depends on how regularly water reaches the neighbourhood. We do not recommend a tank much larger than needed, because water that stands for a long time needs more care. Nor do we recommend a small tank that forces the family to refill it constantly.
If the plot is narrow, we suggest a long or square shape depending on the available space. What matters is that the tank keeps an inspection opening that is easy to reach for cleaning and maintenance, and that it sits a safe distance from drainage chambers and sewer lines. It is best placed where rainwater and yard washing water do not collect, with enough clearance around it for a maintenance worker and light equipment to reach it when needed.
Building a concrete water tank is precise structural work. The tank carries water pressure from inside and soil pressure from outside at the same time. Any weakness at a single stage appears later as cracks or seepage that are hard to treat once the tank is full.
The tank is not backfilled before the fill test confirms there is no seepage. Inlet and outlet pipes do not pass through the wall without puddle flanges or seals around them. The inner concrete surface is not left rough or full of voids, because it becomes a place where sediment collects. The floor should have a slight fall toward a point that makes emptying and cleaning easy.
At Yam Integrated Construction we follow every one of these steps under engineering supervision and send the client photos of the reinforcement before casting and of the fill test.
Water tank waterproofing is what protects the water from contamination and the concrete from damage. However good the concrete is, it has fine pores that water can seep through over time. That is why a tank needs different waterproofing layers, each with a specific job.
This is the layer in direct contact with the water. It must be a material that is safe for drinking water and approved for that use. Among the best known are epoxy coatings made for potable water tanks and some types of flexible cementitious coatings. Before applying it, the surface is cleaned and any honeycombing or crack is treated, then the coating is applied at the thickness the manufacturer specifies.
An underground tank is surrounded by soil, moisture and salts. It is therefore waterproofed on the outside with bituminous membranes or waterproof coatings suitable for buried elements. The waterproofing is protected with a layer before backfilling so it is not torn when the soil goes back in. This waterproofing stops groundwater and salts from entering the tank and protects the reinforcement.
A tank on the roof is exposed to the sun all day. Without thermal insulation the water heats up in summer and the concrete is affected by expansion and contraction. The solution is to cover the roof and outer walls with insulation boards such as XPS or with heat reflective layers, protected from UV. Thermal insulation also helps protect the waterproofing on the tank roof from cracking due to heat.
Good waterproofing starts from a good surface. If the material is applied over dust, moisture or weak areas, it will detach over time however good it is. That is why we give surface preparation enough time before any layer.
| Type of waterproofing | Its job |
|---|---|
| Internal | Protecting the water from contamination and stopping seepage from inside |
| External | Stopping soil moisture and salts from getting in and protecting the steel |
| Thermal | Reducing how much the water heats up in roof tanks |
Many tanks in older villas run for years without anyone inspecting them. Over time the concrete wears, the waterproofing weakens and the steel starts to rust. Repairing a water tank at the right time saves you demolishing it and building a new one.
If the steel is corroded over wide areas, or the cracks are structural and run through all the walls, a new tank may be the better option. This decision needs an engineering inspection, not just a technician's opinion. Most importantly, waterproofing paint should never simply be applied over damaged concrete, because the problem will return quickly. Likewise, a crack should not be repaired from the inside only if its cause is soil movement or a leak from outside. Treatment starts by finding the cause and then repairing the effect.
At Yam Integrated Construction we provide a written report on the tank's condition after the inspection, with photos showing the damage. We then send a quotation that sets out the required work in detail.
Even the best tank needs regular cleaning. Sediment and sand that arrive with the water collect on the floor. Insects or dust may enter through an opening that is not sealed. Proper cleaning maintains water quality and extends the life of the internal waterproofing.
Using strong household cleaners or products not intended for drinking water damages the waterproofing and may leave a trace in the water. Using coarse metal brushes scratches the epoxy coating and opens a path for leaks. A worker entering the tank without enough ventilation puts their safety at risk. Leaving the tank open for a long time after washing lets dust back in.
After handing over a new or repaired tank, we give the client a written care schedule that suits how it is used. How often it needs cleaning depends on the quality of the incoming water, the neighbourhood and the amount of dust. We recommend inspecting the tank after severe sandstorms and after any excavation work nearby. Any change you notice in the water or the level deserves an early inspection before it turns into a bigger repair.
A concrete tank is affected by where it is built. A design that suits one region may need adjusting in another. That is why we always ask about the city and the nature of the soil before setting the specifications.
In Riyadh, Qassim, Al Kharj and Hail the heat is high, the air is dry and dust is frequent. In summer, concrete is best cast early in the morning or in the evening. Concrete here needs good water curing after casting so it does not crack. Roof tanks need thermal insulation to keep the water from heating up, and ventilation openings need mesh that keeps dust out.
In Jeddah, Dammam, Al Khobar, Jubail and Jazan, humidity is high and groundwater is close to the surface and often saline. This makes the external waterproofing of an underground tank more important than anywhere else. We choose salt resistant concrete and pay attention to the concrete cover over the steel so it does not rust early.
In Abha, Khamis Mushait and Al Baha there is more rain and winters are cold. We design the tank roof with a fall that drains water and protect exposed pipes from the cold. We also take into account the rocky ground, which may need a different excavation method.
That is why an accurate price cannot be given before these details are known. A quotation that comes back with a quick figure, without a site visit or questions, often hides items that will appear later. It is better to compare quotations on the same specifications, not on the final figure alone.
If the tank is part of a villa under construction, it is best built alongside the structural works. Excavation, casting and waterproofing then follow one plan and one team. The chance of tank pipes clashing with foundations or drainage lines is reduced, and it is easier to fix the location of the pump room and the route of the lines to the roof tank from the start.
A tank is usually buried underground or hidden on the roof. That makes it hard for the client to judge its quality after handover. The answer is to choose a contractor who explains every step to you and documents it before it disappears under backfill or waterproofing.
A written quotation states the tank type and its internal dimensions clearly. It says whether it includes excavation, backfilling and removal of spoil. It names the concrete, steel and waterproofing specifications. It sets out what the handover includes, such as openings, an internal ladder, pipes and a float valve. It explains the payment method and the warranty details and what they cover. For repair work, the quotation should state the defects to be treated and the method used for each one.
A quotation that does not name the waterproofing type or just says waterproofing in general terms. A contractor who refuses a fill test or rushes the backfill. A price given without inspecting a site that needs excavation. These are signs worth stopping at before you sign.
We start with a site visit to understand your water needs and the space available for installation. We then send a written quotation with the specifications and items. During the work, the project engineer follows every stage and we send you photos of the reinforcement, the waterproofing and the fill test. We use approved materials, and one team is responsible for the tank from excavation to handover. At the end you receive a written warranty documented in the contract.
We work from our head office in Riyadh and serve Jeddah, Makkah, Madinah, Dammam, Abha, Tabuk and the other cities of the Kingdom. You can contact us to arrange a site visit.
Choosing the tank capacity is one of the most important decisions in the project. A tank that is too small means constant water deliveries and annoying shortages at peak times. A tank that is too large takes up courtyard space, costs more and may hold water for a long time without it being renewed.
In some large villas and palaces it is better to split the capacity between two tanks or a tank with two chambers. This lets one chamber be cleaned while the other keeps working, so the home never loses water. It also makes it easier to separate drinking water from irrigation water in some projects.
Most villas run on a large ground tank with a smaller roof tank. The ground tank stores the main volume and the roof tank gives the plumbing steady pressure. The roof tank size depends on the roof's load capacity, the number of floors and how the pump is set up.
During the site visit the engineer asks how your family uses water and inspects the site and available space. The engineer then proposes a suitable capacity and explains the reasons behind it. If the standard sizes do not suit your space, we design a custom size tank and show the difference between the two options in the written quotation.
We advise against basing the decision on price alone. Enlarging a tank after it is built costs far more than choosing the right capacity from the start.
Water that sits for a long time in a large tank without being renewed can change in taste and collect sediment. So the capacity should match the family's actual consumption. If the home is left empty for long periods during holidays, we recommend a setup that makes it easy to drain and refresh part of the water. This also relates to how often the tank needs cleaning.
The tank's location matters as much as the quality of its construction. An excellent tank in the wrong place can be exposed to contamination, be hard to reach for cleaning or suffer from cars driving over it. That is why the engineer sets the location only after studying the whole courtyard.
If the tank sits under the car shade or a driveway, its roof needs a structural design that carries those loads. The access cover should stand slightly above ground level and seal tightly so wash water and oil cannot enter the tank.
Before excavation the engineer checks the soil on site. In parts of Riyadh the ground is rocky and needs special excavation equipment. In coastal areas such as Jeddah, Dammam and Khobar the water table can be close to the surface, so the tank needs stronger external waterproofing and a check of the uplift force on it when empty.
We agree with you on the access route for equipment and where excavated soil and materials will be placed. We protect nearby floors and boundary walls. If there are buried power or water lines in the courtyard, we locate their routes before digging so they are not damaged.
In existing villas we choose a location that avoids breaking finished work such as marble or landscaping wherever possible. If breaking out is unavoidable, the quotation states who reinstates it and with which material. You can learn more about courtyard preparation through our construction works service, which we carry out alongside tanks.
Leave a clear area around the tank opening without planters or fixed furniture. During cleaning the team needs space for equipment and for pumping out water. Do not cover the lid with a fixed floor finish that is hard to remove, because then every maintenance visit means breaking something.
Verbal promises about quality are not enough. Written specifications protect you and tell the contractor exactly what must be built. When comparing quotations, the specifications reveal the real difference between offers, even when the prices are close.
The contract should state the fill test method and the observation period before backfilling and handover. It should also state who pays to fix any leak found during the test. This clause alone shows how confident a contractor is in their work.
At Yam Integrated Construction we write these specifications into the quotation item by item. If you have drawings from an engineering office, we follow them and review them with you before starting.
If the project includes a roof tank, ask for its type, material and fixing method on the roof to be written down. The quotation should show the base the tank sits on, how its weight is spread across the roof and whether it has thermal insulation or a shade against the sun. It should also cover how it connects to the ground tank, the pump and the electric float switch.
The more precise the specifications, the fewer disputes during and after construction. Ask for a simple drawing with the quotation showing the tank dimensions and the positions of openings and pipes so you can review it before work begins.
A tank does not work on its own. Getting water to every tap in the home depends on the pump, the float, the pipes and the valves. Many complaints about weak or interrupted water come from the connections rather than the tank itself.
The pump is chosen according to the number of floors, the pipe length and how many outlets run at the same time. An undersized pump gives low pressure on upper floors, while an oversized one uses more electricity and strains the plumbing. In some villas a constant pressure system is a better fit because it supplies water continuously without needing a large roof tank.
The float prevents the roof tank from overflowing and stops the pump when the ground tank runs low. An electric float that protects the pump from running dry is essential, because running a pump without water damages it quickly. We recommend checking floats regularly, as they are among the parts most prone to faults.
We use pipes suitable for drinking water, with a main valve where water enters the tank and another where it leaves. We add flexible connectors at the pump so vibration does not travel along the pipes. Every pipe that passes through the tank wall goes through a sleeve fixed during casting, sealed with a watertight compound.
The pipe route from the tank to the home must agree with the courtyard, marble and landscaping works. New floors should never be broken out to run a forgotten pipe. So we draw the route before excavation and give you a photo of it once finished. If the villa has a pool, we separate its filling line from the house lines, and you can see how the two are coordinated on our pool design and construction page.
Listen to the pump from time to time. Loud noise, vibration or frequent stopping and starting are signs it needs checking. The cause is often air in the pipes, a small leak or a float that is not working properly.
After installation we give you a simple explanation of how to start and stop the pump and where every valve is. Knowing the main valve in particular saves a lot of water and damage if a sudden leak happens in the home.
Tank works carry risks that do not appear in most other building tasks. Deep excavation, working inside an enclosed space and handling disinfection and waterproofing products all need clear precautions. A responsible contractor explains these precautions before starting and leaves nothing to chance.
A tank is an enclosed space with little ventilation. Working inside during waterproofing or cleaning can expose a worker to product fumes or a lack of air. So the tank must be ventilated before anyone goes in, with an extraction fan running during the work. One worker always stays outside the opening to watch and stay in contact with the person inside.
Disinfection and waterproofing products need storage out of children's reach and away from direct sun. Workers wear gloves, a mask and goggles when using them. After disinfection the tank is rinsed thoroughly and is not returned to drinking water use until the product has fully cleared.
No electrical tool is used inside the tank unless it is rated for wet locations. Power to the pumps is isolated before any work in the tank or pump room.
At Yam Integrated Construction the engineer oversees these precautions at every stage. We coordinate working times with you so they do not clash with family movement in the courtyard.
Casting day needs space for the concrete truck and pump to move. We agree their parking position with you in advance, move private cars away and ask that children stay out of the courtyard throughout the work. We confirm the formwork is secure before casting so it cannot collapse under the weight of the concrete.
Safety is a shared responsibility between the team and the household, so we go through these points with you on the first day of work.
Tank defects usually hide under soil or beneath the waterproofing layer. That is why you should watch the work at every stage before it is covered. Some signs are obvious to any homeowner who visits the site regularly.
If the water level drops without use, or damp patches appear on the outer walls, this points to a leak. It must be fixed before backfilling, because reaching it afterwards means excavation and higher cost. Do not accept explanations such as the concrete will seal itself over time.
Watch for a roof tank that tilts or water collecting beneath it on the roof. This signals a leak from the connections or the tank itself and over time can affect the roof waterproofing and the top floor ceiling. Make sure its lid is tight and keeps out dust and birds.
Photograph the issue, send it to the contractor in writing and ask for an inspection. If the tank is under warranty, the repair falls on the contractor according to the contract. If the tank is old, it needs an inspection to find the source of the problem before choosing a repair method.
At YAMIC we send you photos of every stage before it is covered, such as the steel before casting and the waterproofing before backfilling. This gives you a photo record of how the work was done. The earlier a defect is found, the easier and cheaper it is to fix.
Receiving a tank is not just seeing the cover closed and water reaching the house. A few simple steps make sure you receive a sound tank and that your rights are protected if a problem appears later.
The written warranty in the contract covers workmanship defects such as leaks through the walls or floor and waterproofing failure due to poor application. The contract sets the warranty period, how to report a problem and the response time. The warranty usually does not cover damage caused by digging or heavy loads over the tank, alterations by another party or unsuitable cleaning products.
Record the date of every cleaning and maintenance visit. This record helps you follow the tank's condition and shows you followed the care instructions if you need to claim under the warranty. If you notice any change in the water or its level, contact us directly and we will send the team to inspect.
At Yam Integrated Construction we explain the warranty terms before signing and hand you a complete file of documents with the tank. You can contact us with any question about your tank.
For repaired tanks, ask for photos of the condition before repair and after each step. These show what was actually done, from removing the old waterproofing to treating cracks and steel and then applying the new system. A repaired tank should go through the same fill test as a new one.
Keep a digital copy of the photos and documents so they are not lost over time.
A villa tank differs from the tank of a residential building, a commercial complex or a school. The more users there are, the more continuity and easy maintenance without water interruption matter. At the same time, many owners of existing villas find their tank no longer meets their needs and look for a way to add capacity.
On these projects we work to the drawings approved by the consultant and send regular photo reports to the owner and the supervisor. We build project tanks in Riyadh, Jeddah, Dammam, Jubail, Al Ahsa, Buraidah and other cities across the Kingdom.
Enlarging the concrete tank itself is difficult, because bonding new concrete to old under water pressure needs careful treatment and the joint may leak. So the solution is usually one of the following options.
| Option | When it suits | What to consider |
|---|---|---|
| A second ground tank | When there is space in the courtyard | Connecting it to the first tank with pipes and valves |
| A larger roof tank | When the issue is pressure and continuity | Checking the roof's load capacity |
| Demolishing and building a new tank | When the old one is badly deteriorated | Arranging a temporary water supply during the work |
The engineer first inspects the condition of the existing tank. If it has leaks or corroded steel, there is no point connecting it to a new tank before repairing it. If it is sound, it can stay in use with new capacity added beside it. We set out the options in the written quotation with the advantages of each and what it requires on site.
In occupied residential buildings and complexes, residents cannot be without water for long. So we arrange a temporary solution, such as a portable standby tank, before starting and tell residents when pressure may drop. Noisy works are carried out at times agreed with the owner so the building keeps running calmly.
In every case the supervising engineer remains responsible for the project from the site visit to handover.
The questions clients ask us most before ordering a concrete tank
Send us the size you need and your site location, and we will send a clear quote covering the tank, supply and installation with no surprises.
Almost the same capacity with different dimensions to fit the space you have. We help you choose based on the installation area.
Yes. Every tank carries a 10-year warranty against leaks and manufacturing defects, and we explain the warranty terms before you order.
Yes. We deliver and install tanks in every city and region of Saudi Arabia: Riyadh, Jeddah, Makkah, Madinah, Dammam, Khobar and more.
Of course. The listed sizes are the most requested, but we can build a custom-size tank to fit your space exactly.
Payment is a deposit when you order and the balance on delivery or installation, agreed with you in detail before work starts.
Yes, in many cases, after studying the loads above the tank and the distance from drainage lines. The roof is then designed to carry the weight of cars, with the inspection opening kept somewhere easy to reach.
Epoxy gives a smooth surface that is easy to clean and resists sediment. Flexible cementitious waterproofing bonds with the concrete and suits some cases. The engineer decides which is more suitable based on the condition of the tank and how it is used.
Yes, the work is usually done while the family stays at home. We arrange a temporary water solution with you while the tank is emptied and repaired, and we explain the expected downtime after the inspection.
We close the valves and monitor the tank level, then inspect the surrounding walls and pipes. This test pinpoints the source of the leak before any repair begins.
We clean and disinfect together using products approved for drinking water. We check the waterproofing and openings during the work and tell you about anything that needs repair.
Yes, after inspecting the roof and confirming it can carry the weight of the tank and the water. If the roof needs strengthening, the engineer specifies it before work starts.
Leave your details and WhatsApp will open with your message ready to send to our support team.